Last updated 2010 February 26
Class Schedule
The class schedule is a guide to topics that will be discussed
and when they will be discussed on a weekly basis.
All slide sets are files. To save paper and ink, I suggest you do not print slides too far in advance and not before the course begins as changes may be made.
Week 1 -- January 4 & 6
Eiffel programming; classes; and objects.
- Readings Required: Chapters 7, 8
- Readings Background: Chapters 1, 2 -- Also
see links under Eiffel on the resources page on estudio guided tour
- Slides:
- Case studies:
Week 2 -- January 11 & 13
Agents and tuples; Software Quality & Engineering -- the context for design; What is design; Memory management; Genericity;
- Readings Required: Chapters 9, 10
- Readings Background: Chapter 26
- Slides:
- Case studies:
- agents and tuples -- shows how they are used in program text
- See how agents are used in testing systems
Week 3 -- January 18 & 20 (Report 1 due)
Basis of Design by Contract -- Assertions; Design by successive refinement (top down design)
- Readings required: Chapters 11-1 .. 11-9, 11-11, 11-12
- Slides:
- Case studies: See how assertions are used in programs
bank 1,
dictionary,
sparse matrix
Week 4 -- January 25 & 27 (Report 2 due)
Abstract data types and bottom up design; Referential transparency, active data structures
Week 5 -- February 1 & 3 (Class test 1)
Design by contract
Week 6 -- February 8 & 10
Exceptions; Espec; Inheritance; Inheritance and adaptation
- Readings required: Chapters 12-1 .. 12-5, 14, 27.7
- Slides:
- Case studies: testing with eSpec,
Week 7 -- February 22 & 24 (Report 3 due)
Multiple inheritance; Inheritance and design by contract and genericity; global objects
- Readings required: Chapter 15, 16, 18
- Slides:
- Case studies:
Week 8 -- March 1 & 3
Designing classes; Design Patterns -- Adapter, Visitor
Week 9 -- March 8 & 10 (Class Test 2)
Design patterns -- Iterator, Observer
Week 10 -- March 15 & 17 (Report 4 due)
Design patterns -- Singleton, Decorator, Composite study, Composite
Week 11 -- March 22 & 24
Design patterns -- Command & do-undo case, State & Multi-panel case study
Week 12 -- March 29 & 31 (Report 5 due)
Design patterns -- Abstract Factory, Builder, Prototype
| Subject to change.
|
|
Time permitting some of the following may be done
Background slides